Loading
Portfolio image

3 kW Solar System Price

 3 kW Solar System Price in India (2025) – A Smart Solar Investment for Homes

Affordable | MNRE-Approved | Net Metering | 25-Year Panel Warranty

A 3 kW solar system is one of the most popular choices for homeowners in India. It offers the perfect balance between affordability, power generation, and space efficiency, making it ideal for a medium-sized household with 3–5 family members and moderate electricity usage.

At Sarvayogam Solar, we provide high-quality, MNRE-approved 3 kW rooftop solar systems—installed by professionals, backed by warranties, and eligible for government subsidies.


💰 3 kW Solar System Price in India (2025)

System Type

Price (Before Subsidy)

With Subsidy (Approx.)

On-Grid System

₹1,60,000 – ₹1,90,000

₹1,10,000 – ₹1,25,000

Hybrid System

₹2,40,000 – ₹2,80,000

Not typically subsidized

Off-Grid System

₹2,00,000 – ₹2,40,000

Not typically subsidized

Prices include panels, inverter, structure, wiring, and installation. GST extra as applicable.


How Much Power Does a 3 kW Solar System Generate?

  • Daily Output: 12–15 units/day
  • Monthly Output: ~360–450 units/month
  • Annual Output: ~4,500–5,400 units/year
  • Savings: ₹2,000 – ₹3,000/month on average

📐 Space Requirement

A 3 kW rooftop solar system typically needs:

  • 250 – 300 sq. ft of shadow-free rooftop space
  • Preferably south-facing or flat roof for best performance

🎁 Government Subsidy for 3 kW Solar System

Under the PM Surya Ghar Muft Bijli Yojana (2024–25) and MNRE Rooftop Solar Scheme, homeowners can avail:

  • ₹18,000/kW subsidy for systems up to 3 kW
  • Approx. ₹54,000 subsidy for 3 kW
  • Net metering benefit to export excess power

We assist in applying and securing subsidies directly from the National Portal for Rooftop Solar.


🔋 Components Included in the 3 kW System

  • MNRE-approved Mono PERC Solar Panels (400W+)
  • High-efficiency Solar Inverter (On-grid or Hybrid)
  • Galvanized Iron or Aluminum Mounting Structure
  • DC/AC cables, safety switches, MCBs, connectors
  • Net metering & DISCOM liaison (for on-grid systems)
  • Installation & performance guarantee

🛠 Installation Timeline

  • 🔍 Site Inspection & Shadow Analysis – 1–2 Days
  • 📐 Design & Documentation – 2–3 Days
  • 🏗️ Installation & Wiring – 2–4 Days
  • Net Metering & Commissioning – 5–10 Days

Total Time: 7–15 working days


📞 Get Your Free Quote Today

Ready to install a 3 kW rooftop solar system for your home?
We offer easy EMI, subsidy support, and hassle-free installation.

📧 Email: sarvayogamgroup@gmail.com
📞 Call: +91 95103 56575


🌞 Sarvayogam Solar – Powering Indian Homes with Clean Energy

Choose our 3 kW solar package for maximum savings, trusted components, and full government compliance. Let your roof earn for you!

 

Our Coverage

Go Up