Loading
Portfolio image

3 kW Solar System Price

 3 kW Solar System Price in India (2025) – A Smart Solar Investment for Homes

Affordable | MNRE-Approved | Net Metering | 25-Year Panel Warranty

A 3 kW solar system is one of the most popular choices for homeowners in India. It offers the perfect balance between affordability, power generation, and space efficiency, making it ideal for a medium-sized household with 3–5 family members and moderate electricity usage.

At Sarvayogam Solar, we provide high-quality, MNRE-approved 3 kW rooftop solar systems—installed by professionals, backed by warranties, and eligible for government subsidies.


💰 3 kW Solar System Price in India (2025)

System Type

Price (Before Subsidy)

With Subsidy (Approx.)

On-Grid System

₹1,60,000 – ₹1,90,000

₹1,10,000 – ₹1,25,000

Hybrid System

₹2,40,000 – ₹2,80,000

Not typically subsidized

Off-Grid System

₹2,00,000 – ₹2,40,000

Not typically subsidized

Prices include panels, inverter, structure, wiring, and installation. GST extra as applicable.


How Much Power Does a 3 kW Solar System Generate?

  • Daily Output: 12–15 units/day
  • Monthly Output: ~360–450 units/month
  • Annual Output: ~4,500–5,400 units/year
  • Savings: ₹2,000 – ₹3,000/month on average

📐 Space Requirement

A 3 kW rooftop solar system typically needs:

  • 250 – 300 sq. ft of shadow-free rooftop space
  • Preferably south-facing or flat roof for best performance

🎁 Government Subsidy for 3 kW Solar System

Under the PM Surya Ghar Muft Bijli Yojana (2024–25) and MNRE Rooftop Solar Scheme, homeowners can avail:

  • ₹18,000/kW subsidy for systems up to 3 kW
  • Approx. ₹54,000 subsidy for 3 kW
  • Net metering benefit to export excess power

We assist in applying and securing subsidies directly from the National Portal for Rooftop Solar.


🔋 Components Included in the 3 kW System

  • MNRE-approved Mono PERC Solar Panels (400W+)
  • High-efficiency Solar Inverter (On-grid or Hybrid)
  • Galvanized Iron or Aluminum Mounting Structure
  • DC/AC cables, safety switches, MCBs, connectors
  • Net metering & DISCOM liaison (for on-grid systems)
  • Installation & performance guarantee

🛠 Installation Timeline

  • 🔍 Site Inspection & Shadow Analysis – 1–2 Days
  • 📐 Design & Documentation – 2–3 Days
  • 🏗️ Installation & Wiring – 2–4 Days
  • Net Metering & Commissioning – 5–10 Days

Total Time: 7–15 working days


📞 Get Your Free Quote Today

Ready to install a 3 kW rooftop solar system for your home?
We offer easy EMI, subsidy support, and hassle-free installation.

📧 Email: sarvayogamgroup@gmail.com
📞 Call: +91 95103 56575


🌞 Sarvayogam Solar – Powering Indian Homes with Clean Energy

Choose our 3 kW solar package for maximum savings, trusted components, and full government compliance. Let your roof earn for you!

 

Our Coverage

Anu
Bag
Dan
Kot
Kot
Kot
Ner
Ota
Rao
Rao
Uba
Wah
Go Up