
3 kW Solar System Price
3 kW Solar System Price
in India (2025) ā A Smart Solar Investment for Homes
Affordable | MNRE-Approved | Net Metering | 25-Year Panel
Warranty
A 3 kW solar system is one of the most popular
choices for homeowners in India. It offers the perfect balance between affordability,
power generation, and space efficiency, making it ideal for a medium-sized
household with 3ā5 family members and moderate electricity usage.
At Sarvayogam Solar, we provide high-quality, MNRE-approved
3 kW rooftop solar systemsāinstalled by professionals, backed by
warranties, and eligible for government subsidies.
š° 3 kW Solar System Price
in India (2025)
System Type |
Price (Before Subsidy) |
With Subsidy (Approx.) |
On-Grid System |
ā¹1,60,000 ā ā¹1,90,000 |
ā¹1,10,000 ā ā¹1,25,000 |
Hybrid System |
ā¹2,40,000 ā ā¹2,80,000 |
Not typically subsidized |
Off-Grid System |
ā¹2,00,000 ā ā¹2,40,000 |
Not typically subsidized |
Prices include panels, inverter, structure, wiring, and
installation. GST extra as applicable.
ā” How Much Power Does a 3 kW
Solar System Generate?
- ā
Daily Output: 12ā15 units/day
- ā
Monthly Output: ~360ā450 units/month
- ā
Annual Output: ~4,500ā5,400 units/year
- ā
Savings: ā¹2,000 ā ā¹3,000/month on average
š Space Requirement
A 3 kW rooftop solar system typically needs:
- 250
ā 300 sq. ft of shadow-free rooftop space
- Preferably
south-facing or flat roof for best performance
š Government Subsidy for
3 kW Solar System
Under the PM Surya Ghar Muft Bijli Yojana (2024ā25)
and MNRE Rooftop Solar Scheme, homeowners can avail:
- ā
ā¹18,000/kW subsidy for systems up to 3 kW
- ā
Approx. ā¹54,000 subsidy for 3 kW
- ā
Net metering benefit to export excess power
We assist in applying and securing subsidies directly
from the National Portal for Rooftop Solar.
š Components Included in
the 3 kW System
- MNRE-approved
Mono PERC Solar Panels (400W+)
- High-efficiency
Solar Inverter (On-grid or Hybrid)
- Galvanized
Iron or Aluminum Mounting Structure
- DC/AC
cables, safety switches, MCBs, connectors
- Net
metering & DISCOM liaison (for on-grid systems)
- Installation
& performance guarantee
š Installation Timeline
- š
Site Inspection & Shadow Analysis ā 1ā2 Days
- š
Design & Documentation ā 2ā3 Days
- šļø
Installation & Wiring ā 2ā4 Days
- ā”
Net Metering & Commissioning ā 5ā10 Days
Total Time: 7ā15 working days
š Get Your Free Quote
Today
Ready to install a 3 kW rooftop solar system for your
home?
We offer easy EMI, subsidy support, and hassle-free installation.
š§ Email:
sarvayogamgroup@gmail.com
š
Call: +91 95103 56575
š Sarvayogam Solar ā
Powering Indian Homes with Clean Energy
Choose our 3 kW solar package for maximum savings,
trusted components, and full government compliance. Let your roof earn for you!